A custom packaging quote becomes more accurate when the supplier understands exactly what product is being packed, how many boxes are required, what the packaging needs to do and where the finished boxes need to be delivered.
You do not need to know every technical packaging specification before contacting a manufacturer.
But you should provide the facts you already know and clearly identify the areas where you need a recommendation.
A useful packaging brief normally covers:
Product → Dimensions → Quantity → Structure → Insert → Material → Printing & Finishing → Artwork → Destination → Required Date
The clearer these inputs are, the easier it becomes to compare quotations, plan sampling and avoid costly specification changes later.
1. Why Is “How Much Is a Custom Box?” Difficult to Answer?
A custom box does not have one fixed price.
Consider two boxes that look almost identical in a photograph.
Box A
-
500 pcs
-
2 mm rigid board
-
Standard printed paper
-
Paper insert
-
Simple logo
Box B
-
5,000 pcs
-
Specialty paper
-
EVA insert
-
Foil
-
Embossing
-
Magnets
-
Custom accessories
They may have similar external dimensions but completely different:
-
Material cost
-
Tooling
-
Production process
-
Assembly
-
Freight volume
Therefore, asking:
How much is this box?
with only one reference image usually produces either:
a rough estimate
or:
a long list of questions from the supplier.
A clear RFQ helps both sides reach a meaningful quotation faster.
2. What Information Is Needed for a Custom Packaging Quote?
A useful initial packaging brief should include as much of the following as possible:
| Information | Why It Matters |
|---|---|
| Product | Determines packaging requirements |
| Product dimensions | Helps define internal space |
| Product weight | Affects structure and insert |
| Quantity | Strongly affects unit economics |
| Quantity per SKU | Determines actual production setup |
| Preferred box style | Affects materials and assembly |
| Insert requirement | Affects protection and cost |
| Printing | Defines production process |
| Finishing | May require additional tooling |
| Artwork status | Affects development schedule |
| Reference images | Helps communicate visual direction |
| Destination | Needed for freight planning |
| Required date | Determines project schedule |
| Target budget | Helps recommend realistic structures |
Not every field needs to be finalized before the first conversation.
If something is undecided, write:
Open to supplier recommendation.
That is much better than inventing a specification.
3. Start With the Product, Not the Box
One of the best ways to begin a packaging enquiry is to explain:
What are you packaging?
For example:
50 ml glass perfume bottle
is much more useful than:
luxury perfume box required.
Similarly:
one 700 ml glass spirits bottle weighing 1.2 kg when filled
provides more useful engineering information than:
need wine box.
The supplier needs to understand the product before recommending the packaging.
4. Provide Product Dimensions
For most projects, send:
Length × Width × Height
and always include the unit.
For example:
85 × 45 × 130 mm
Do not send:
85 × 45 × 130
without saying whether the measurement is:
-
mm
-
cm
-
inches
Also state whether the dimensions refer to:
the product
or:
the packaging.
These are different specifications.
5. Product Dimensions, Internal Dimensions and External Dimensions Are Different
This is an important distinction.
Product Dimensions
The physical size of the item being packed.
Internal Box Dimensions
The usable space inside the packaging.
External Box Dimensions
The final outside dimensions of the completed package.
They should not be treated as interchangeable.
For example, a perfume bottle may measure:
80 × 40 × 120 mm
but the finished outer box needs additional space for:
-
Insert
-
Board thickness
-
Product clearance
-
Opening structure
If you are unsure of the final box size, provide the product dimensions and let the packaging engineer recommend the packaging dimensions.
6. Product Weight Matters
Weight is frequently missing from packaging enquiries.
But it can affect:
-
Greyboard thickness
-
Insert strength
-
Bottom support
-
Drawer behavior
-
Carrying structure
-
Shipping requirements
A lightweight cosmetic tube and a heavy glass perfume bottle may have similar dimensions but need very different packaging structures.
For heavy products such as:
-
Wine
-
Spirits
-
Glass skincare jars
-
Electronics
provide the actual packed product weight whenever possible.
7. Send Product Photos
Photos help the supplier understand details that dimensions alone may not explain.
Useful photos include:
-
Front
-
Side
-
Top
-
Bottom
-
Closure
-
Irregular shapes
For bottles, photos can reveal:
-
Shoulder geometry
-
Cap shape
-
Base shape
For watches:
-
Bracelet
-
Clasp
-
Crown
For jewelry:
-
Setting height
-
Chain
-
Product orientation
A physical sample or accurate 3D file may still be required later, but photos are very useful during initial quotation and structural discussion.
8. Tell the Supplier What Packaging Is For
The same product may require different packaging for different purposes.
For example:
Retail
Priorities may include:
-
Shelf presentation
-
Cost
-
Storage efficiency
E-Commerce
Priorities may include:
-
Protection
-
Shipping volume
-
Outer mailer compatibility
PR / Influencer
Priorities may include:
-
Product reveal
-
Interior graphics
-
Camera-friendly presentation
Corporate Gifting
Priorities may include:
-
Gift experience
-
Branding
-
Accessories
Limited Edition
Priorities may include:
-
Collector value
-
Unique structure
-
Premium finishing
Telling the supplier the sales channel helps them recommend the right structure instead of simply copying a reference image.
9. Give an Estimated Quantity
Quantity strongly affects custom packaging pricing.
Instead of writing:
Need price.
write:
Initial quantity: approximately 1,000 pcs.
Even better, request several realistic options:
500 pcs
1,000 pcs
2,500 pcs
5,000 pcs
This allows you to see how unit economics change with volume.
Quantity is one of the main drivers behind a useful custom packaging quote.
10. Always State Quantity Per SKU
This becomes important when a project contains:
-
Different sizes
-
Different colors
-
Different artworks
-
Different fragrances
-
Different product names
For example:
Total quantity: 5,000 pcs
is incomplete if the real requirement is:
5 designs × 1,000 pcs each.
Each SKU may require separate:
-
Printing
-
Artwork
-
Color setup
-
QC
-
Packing
Therefore send:
Total quantity
and:
Quantity per SKU.
11. MOQ and Target Quantity Are Different
Suppose a supplier has a practical MOQ of:
500 pcs.
That does not mean your best order quantity is automatically 500 pcs.
The appropriate quantity also depends on:
-
Forecast demand
-
Inventory
-
Storage
-
Cash flow
-
Reorder lead time
-
Seasonal risk
If you are still deciding, say:
Please quote 500 / 1,000 / 2,500 pcs.
The supplier can then show the quantity breaks.
The broader custom packaging MOQ decision should balance manufacturing efficiency with inventory risk.
12. Tell the Supplier Which Box Structure You Prefer
If you already know the structure, mention it.
For example:
-
Lid-and-base rigid box
-
Magnetic book-style box
-
Drawer box
-
Double-door box
-
Folding rigid box
-
Folding carton
-
Tube
-
Sleeve
If you do not know, that is fine.
Instead of guessing, write:
Structure open to recommendation. We want a premium opening experience with minimal shipping volume.
That gives the packaging engineer a real design brief.
13. Reference Images Are Useful — But They Are Not a Specification
Reference images are one of the fastest ways to communicate:
-
Opening style
-
Color direction
-
Structure
-
Material feel
-
Visual quality
But one image does not answer everything.
A photo cannot reliably tell the supplier:
-
Dimensions
-
Board thickness
-
Insert material
-
Quantity
-
Hidden structure
-
Shipping requirement
Therefore, use reference images to explain:
what you like
rather than asking the supplier to guess the full specification.
For example:
We like the opening structure in this image, but we want a paper insert instead of EVA.
That is much more useful than:
Same as photo. Price?
14. Explain Which Part of the Reference You Like
A reference box may contain several design ideas.
Tell the supplier whether you like the:
-
Structure
-
Opening
-
Color
-
Paper texture
-
Insert
-
Logo position
-
Foil
-
Shape
For example:
We like the double-door opening, but not the velvet interior.
or:
We want the drawer structure, but the exterior should be burgundy textured paper.
This prevents the supplier from assuming every detail in the reference image needs to be copied.
15. Describe the Insert Requirement
The insert can significantly affect:
-
Product fit
-
Protection
-
Box dimensions
-
Cost
-
Sustainability
-
Sampling
Common options include:
-
Structural paperboard
-
Molded pulp
-
EVA
-
EPE
-
Wrapped insert
-
Fabric-covered tray
If you do not know which material to use, provide the product information and say:
Insert material open to recommendation.
The choice between molded pulp, EVA and paper inserts should be based on the actual product rather than simply choosing the material that looks most premium.
16. Tell the Supplier How Many Products Go Inside
This seems obvious, but it is often missing.
For example:
A skincare PR box might contain:
-
3 bottles
-
1 jar
-
1 headband
-
1 card
A wine gift set might contain:
-
1 bottle
-
2 glasses
-
1 opener
A jewelry set might contain:
-
Necklace
-
Bracelet
-
Earrings
The supplier needs to know the complete contents before developing:
-
Internal dimensions
-
Insert
-
Layout
-
Box depth
Adding an extra accessory after sampling can force the entire box to be redesigned.
17. State Your Material Preference — If You Have One
Possible directions include:
-
Specialty paper
-
Printed art paper
-
Kraft paper
-
Textured paper
-
FSC-certified paper
-
Fabric
-
Leatherette
If you have no material specification, explain the desired visual direction instead.
For example:
Matte, tactile, minimal luxury appearance. Avoid glossy lamination.
This gives the supplier enough information to recommend suitable materials.
Do not invent:
-
Paper grade
-
GSM
-
Board thickness
unless those are genuine project requirements.
18. Separate Requirements From Preferences
A strong RFQ distinguishes between:
Must Have
For example:
-
No plastic insert
-
Burgundy exterior
-
500 pcs minimum order
-
Must fit two glass bottles
-
Delivery before a fixed event
and:
Preferred
For example:
-
Magnetic closure preferred
-
Gold foil preferred
-
Textured paper preferred
and:
Open to Recommendation
For example:
-
Board thickness
-
Insert engineering
-
Exact box dimensions
This gives the packaging supplier room to optimize the project without accidentally changing a non-negotiable requirement.
19. Specify Printing Requirements
If known, provide:
-
CMYK
-
Pantone color
-
One-color printing
-
Interior printing
-
Full-color printing
If exact printing technology is not known, simply explain:
Burgundy exterior with white logo.
or:
Full-color artwork outside, plain black inside.
The packaging manufacturer can then recommend a suitable production method.
20. Specify Finishing Requirements
Premium finishing may include:
-
Hot foil stamping
-
Embossing
-
Debossing
-
Spot UV
-
Matte lamination
-
Soft-touch lamination
-
Laser cutting
-
Specialty coatings
Do not simply write:
Premium finish.
Explain what you actually want.
For example:
Small gold foil logo centered on lid, with blind embossed pattern around the edge.
This makes the quotation much more specific.
21. Do You Need Finished Artwork Before Requesting a Quote?
No.
A supplier can often provide an initial quotation before final artwork exists.
For an early quotation, it may be enough to provide:
-
Logo
-
Brand colors
-
Reference images
-
General print description
However, final production artwork will normally need to follow the approved dieline and printing requirements.
A useful artwork status can be:
Artwork not started
Logo available
Artwork in progress
Print-ready artwork available
This tells the supplier where the project currently stands.
22. What Files Should You Send?
Useful files can include:
-
PDF
-
AI
-
EPS
-
SVG
-
High-resolution images
-
Product drawings
-
3D files
-
Existing dieline
For logos and production artwork, vector files are generally more useful than screenshots.
Avoid sending only:
-
Low-resolution website screenshots
-
Blurry WhatsApp images
-
Photos of printed artwork
when better source files are available.
However, a rough reference image is still useful at the early concept stage.
23. Tell the Supplier Whether You Need Structural Design
Some buyers already have:
-
Finished dieline
-
Exact dimensions
-
Artwork
Others have only:
-
Product
-
Reference image
-
Brand idea
Both are valid starting points.
Tell the supplier whether you need:
Manufacturing Only
or:
Structural Development + Sampling + Production
The quotation scope can be very different.
24. Share Sustainability Requirements Early
If your project requires:
-
FSC-certified materials
-
Reduced plastic
-
Paper-based insert
-
Molded fiber
-
No plastic lamination
-
Easier material separation
state this before sampling.
Do not wait until the final sample is approved and then ask:
Can we make this FSC?
or:
Can we remove all plastic now?
That may require:
-
New materials
-
New insert
-
New supplier
-
New sample
-
New quotation
For FSC certified packaging, material sourcing and claim requirements should therefore be confirmed at the beginning of the project.
25. Give the Delivery Destination
For international packaging projects, destination matters.
A useful enquiry includes:
Country
and preferably:
City / Postal Code
if a delivered quotation is required.
For example:
Delivery: Helsinki, Finland
or:
Delivery: New York, NY 10001, USA
Shipping cost depends on:
-
Destination
-
Volume
-
Weight
-
Shipping method
-
Trade term
Without a destination, the supplier cannot provide a meaningful delivered cost.
26. Product Price and Delivered Price Are Not the Same
Always confirm whether the quotation is:
-
EXW
-
FOB
-
FCA
-
DAP
-
DDP
-
Another agreed delivery term
These terms affect which:
-
Freight
-
Export costs
-
Import responsibilities
-
Delivery responsibilities
are included.
Do not compare:
USD 3.00 EXW
with:
USD 3.80 DDP
as if the quotations represent the same scope.
For international quotations, the selected Incoterms® rule should also identify the named place or port.
27. Tell the Supplier Your Required Arrival Date
Do not write only:
Urgent.
Instead write:
Packaging must arrive at our warehouse by 15 March 2027.
This allows the supplier to work backwards through:
Shipping
↑
QC
↑
Mass Production
↑
Sample Approval
↑
Sampling
↑
Structural Development
The custom packaging lead time should be planned from the required arrival date rather than only from the factory production schedule.
28. Launch Date and Required Arrival Date Are Different
Suppose the product launches:
1 April.
The packaging may need to arrive much earlier because the buyer still needs time for:
-
Product packing
-
Fulfillment preparation
-
Photography
-
Retail distribution
-
Launch assembly
Therefore, give the supplier:
Required Packaging Arrival Date
rather than only:
Product Launch Date.
29. Should You Share a Target Budget?
When possible, yes.
Some buyers worry that sharing a budget will automatically cause the supplier to quote the maximum amount.
But for custom packaging development, a realistic budget can prevent wasted engineering time.
For example:
If the target is:
USD 2 per box
a supplier should not spend several rounds developing:
-
Complex lift-up mechanism
-
Metal accessories
-
Multi-layer insert
-
Multiple finishing processes
that can never fit the commercial target.
A target budget allows the supplier to recommend a more realistic structure.
30. Budget Does Not Mean Asking for the Cheapest Box
A useful brief might say:
Target packaging cost: approximately USD 2.50–3.00 per unit at 2,000 pcs, excluding international freight.
This gives the packaging engineer a commercial boundary.
The discussion can then focus on:
How do we create the strongest packaging within that target?
rather than:
How do we make the cheapest possible box?
For a deeper breakdown, custom packaging cost should be evaluated together with structure, materials, finishing and quantity.
31. Quantity, Budget and Structure Must Work Together
A project cannot realistically optimize only one variable.
Think of these three factors:
Structure
Quantity
Budget
If the structure becomes more complex while quantity becomes lower, unit cost usually becomes more challenging.
If the budget is fixed, the project may need to adjust:
-
Structure
-
Material
-
Finishing
-
Accessories
A productive supplier conversation should therefore focus on trade-offs rather than unrealistic specifications.
32. Tell the Supplier Whether This Is a First Order or Repeat Program
This information can change the recommendation.
One-Time Campaign
May prioritize:
-
Flexible quantity
-
Limited tooling
-
Lower inventory risk
Long-Term Program
May justify:
-
More tooling
-
Specialized materials
-
Optimized production
-
Repeat-order planning
Pilot Order
May prioritize:
-
Validation
-
Lower volume
-
Production learning
If annual volume is expected to increase, tell the supplier.
For example:
Initial order 500 pcs; expected repeat order 2,000–3,000 pcs.
That helps the factory evaluate both the first order and longer-term production logic.
33. Number of SKUs Matters
A project with:
3,000 identical boxes
is different from:
3,000 boxes across six designs.
Each variation may affect:
-
Printing
-
Color
-
Material
-
QC
-
Packing
Therefore include:
Number of SKUs
and:
Quantity per SKU.
This is particularly important for:
-
Perfume collections
-
Skincare ranges
-
Chocolate flavors
-
Jewelry collections
-
Supplement products
34. What If You Do Not Know the Box Structure Yet?
That is completely acceptable.
A strong enquiry can say:
We need packaging for one 100 ml glass bottle weighing approximately 450 g. The product is positioned as premium skincare. We prefer a paper-based insert and a clean opening experience. Please recommend two suitable rigid-box structures.
This gives the supplier much more useful information than saying:
Need luxury box.
Brands do not need to become packaging engineers before contacting a packaging manufacturer.
They need to provide a clear product and commercial brief.
35. What If You Do Not Know the Material?
Use performance language.
Instead of guessing:
157 gsm art paper + 2 mm greyboard.
say:
We want a matte rigid box with a tactile paper surface, strong enough for a 500 g glass product.
Then the packaging engineer can recommend a suitable material specification.
Technical specifications should be used when they are genuine requirements — not simply copied from another supplier's website.
36. What If You Only Have a Reference Photo?
You can still start a quotation discussion.
Send the reference and add:
What You Like
Example:
-
Opening structure
-
Color
-
Product arrangement
What You Want Changed
Example:
-
Paper insert instead of foam
-
Smaller logo
-
Different size
Your Product
-
Dimensions
-
Weight
-
Quantity
Destination
-
Country / postal code
Date
-
Required arrival date
That is usually enough to begin a useful technical conversation.
37. What If Your Product Is Still Under Development?
Tell the supplier which dimensions are:
confirmed
and which are:
estimated.
For example:
Current bottle dimensions are approximately 55 × 55 × 120 mm; final cap dimensions will be confirmed next month.
The packaging supplier can provide an initial direction, but final structural approval should wait until critical product dimensions are frozen.
Changing the product after the insert has been approved can force:
-
Dieline revisions
-
New samples
-
New quotation
38. Quote, Estimate and Final Price Are Not Always the Same
At early project stage, the supplier may only be able to provide:
budget estimate
because:
-
Dimensions are approximate
-
Material is unknown
-
Insert has not been designed
-
Artwork is incomplete
As the specification becomes more precise, the quotation can become more precise.
Buyers should therefore understand whether the number they receive is:
Budgetary Estimate
or:
Formal Quotation Based on Defined Specifications
This distinction prevents misunderstandings later.
39. How Should You Compare Two Packaging Quotes?
Do not compare only:
Unit Price.
Compare:
| Specification | Supplier A | Supplier B |
|---|---|---|
| Box Structure | ||
| Dimensions | ||
| Board / Material | ||
| Insert | ||
| Printing | ||
| Finishing | ||
| Quantity | ||
| Quantity per SKU | ||
| Tooling | ||
| Sample | ||
| Export Packing | ||
| Incoterm | ||
| Freight | ||
| Lead Time |
If the specifications are different, the prices are not directly comparable.
A cheaper quotation may simply represent a different package.
40. Common RFQ Mistakes
Mistake 1
Sending only:
Price please.
Mistake 2
Sending a reference photo without dimensions.
Mistake 3
Providing box dimensions but not product dimensions.
Mistake 4
Saying:
5,000 pcs
without explaining:
5 SKUs × 1,000 pcs.
Mistake 5
Not providing the delivery country.
Mistake 6
Saying:
Need urgently.
without giving an actual date.
Mistake 7
Requesting:
Eco-friendly material
without defining:
-
FSC?
-
Reduced plastic?
-
Paper insert?
-
No lamination?
Mistake 8
Specifying technical materials copied from another project without knowing whether they suit the new product.
Mistake 9
Comparing EXW and delivered quotations as if they are identical.
Mistake 10
Changing the product dimensions after sampling.
A better RFQ prevents many of these problems before quotation begins.
41. Copy-and-Paste Custom Packaging RFQ Template
Use the following template when contacting a packaging supplier.
Product
Product:
Product dimensions (L × W × H):
Product weight:
Number of products inside one box:
Product photos / drawings available: Yes / No
Packaging
Preferred box type:
Required internal size, if known:
Insert requirement:
Reference images:
Opening preference:
If undecided:
Structure: Open to recommendation
Quantity
Initial order quantity:
Quantity per SKU:
Number of SKUs:
Expected repeat / annual quantity:
Materials
Preferred material:
Sustainability requirement:
FSC requirement: Yes / No
Plastic-reduction requirement:
If undecided:
Material: Open to recommendation
Printing & Finishing
Exterior printing:
Interior printing:
Pantone colors:
Foil:
Embossing / Debossing:
UV / coating:
Artwork
Artwork status:
-
Not started
-
Logo available
-
In progress
-
Print-ready
Dieline available: Yes / No
Commercial
Target packaging budget:
Target market:
Delivery country / postal code:
Preferred delivery term, if known:
Required arrival date:
Additional Notes
What is most important for this project?
For example:
-
Premium opening experience
-
Low shipping volume
-
Paper-based insert
-
Strong protection
-
Luxury retail presentation
-
Fast launch schedule
42. Example of a Good Packaging Enquiry
A useful request could look like this:
We are launching a premium skincare set containing one 50 ml glass jar and two 30 ml glass serum bottles.
Initial quantity is 1,000 sets, with an expected repeat order of 2,500 pieces.
We prefer a rigid gift box with a clean book-style or drawer opening. Please recommend the better structure.
A paper-based insert is preferred instead of EVA.
Exterior should be warm white with a small gold foil logo and minimal printing.
Final artwork is not ready yet, but our logo and Pantone colors are available.
Delivery is required to Germany. We need the packaging at our warehouse before 15 March.
Please quote the initial quantity and one higher quantity option, including sample cost, tooling, production lead time and delivery options.
This enquiry is much easier to evaluate than:
Send best price for luxury skincare box.
43. What Should You Expect From the Supplier After Sending the RFQ?
A professional packaging supplier may respond with additional questions.
That is normal.
The supplier may need to confirm:
-
Exact product dimensions
-
Product weight
-
Internal layout
-
Board specification
-
Insert material
-
Finishing
-
Delivery term
The presence of questions does not necessarily mean the enquiry was incomplete.
It often means the project is moving from:
general brief
to:
production specification.
44. What Should a Good Packaging Quote Contain?
A useful quotation should make it possible to understand what is being priced.
Depending on the project, it may include:
-
Box structure
-
Dimensions
-
Material
-
Insert
-
Printing
-
Finishing
-
Quantity
-
Unit price
-
Tooling
-
Sample fee
-
Production lead time
-
Packing
-
Shipping term
-
Quote validity
If an item is not included, ask.
The purpose of the quotation is not simply to show a number.
It should define the commercial scope of the packaging project.
45. How SEISMO Approaches a New Packaging Enquiry
At SEISMO Packaging, a new custom packaging enquiry should begin with the product and commercial requirements rather than a fixed box template.
Step 1 — Product Review
Review:
-
Dimensions
-
Weight
-
Product type
-
Number of products
Step 2 — Commercial Requirement
Confirm:
-
Quantity
-
Quantity per SKU
-
Target market
-
Budget
-
Delivery date
Step 3 — Structure
Evaluate:
-
Rigid box
-
Drawer
-
Magnetic box
-
Folding carton
-
Other suitable structures
Step 4 — Insert
Determine how the product should be:
-
Positioned
-
Protected
-
Removed
Step 5 — Materials and Finishing
Review:
-
Paper
-
Board
-
Insert material
-
Printing
-
Foil
-
Embossing
-
Other finishes
Step 6 — Initial Quotation
Price the agreed specification or clearly defined options.
Step 7 — Physical Sampling
Confirm:
-
Fit
-
Structure
-
Material
-
Color
-
Finishing
Step 8 — Final Production Specification
Freeze the agreed requirements before mass production.
The objective is to move from:
idea
to:
clear specification
to:
reliable quotation
to:
approved production.
Frequently Asked Questions
What information do I need for a custom packaging quote?
At minimum, provide the product, approximate dimensions, expected quantity and delivery destination. Product weight, reference images, insert needs, finishing, target budget and required date will help the supplier prepare a more useful quotation.
Can I request a packaging quote without finished artwork?
Yes. Finished artwork is not normally required for an initial quotation. A logo, brand colors and reference images are often enough to begin. Final production artwork can be prepared after the structure and dieline are confirmed.
Do I need to know the exact box size before requesting a quote?
No. If you know the product dimensions and packaging requirements, the supplier can help determine a suitable box size. Clearly identify whether any dimensions you provide are product, internal or external dimensions.
Should I tell the supplier my budget?
A realistic target budget can help the supplier recommend a structure and material system that fits the commercial goal. It is particularly useful when several packaging directions are technically possible.
Should I provide quantity per SKU?
Yes. Different artworks, colors, sizes or products may require separate setups. Total quantity alone may not accurately represent production requirements.
What if I do not know which insert material to use?
Provide the product dimensions, weight, photos and protection requirements and ask the supplier to recommend a suitable paperboard, molded pulp, EVA or other insert solution.
Do I need to send the physical product?
Not always for the first quotation. Accurate dimensions, weight and photos can be enough to begin. A physical product is strongly recommended before final approval when insert fit and product stability are important.
Why does the supplier need my delivery destination?
Freight cost depends on destination, package volume, weight and delivery terms. A destination is required if you want a meaningful delivered-price estimate.
Can I get a quote if I only have a reference photo?
Yes. Explain which elements of the reference you like, provide your product dimensions, quantity, destination and required date, and identify the remaining specifications as open to recommendation.
Ready to Request a Custom Packaging Quote?
To help SEISMO evaluate your project, send:
Product + Dimensions + Weight + Quantity per SKU + Reference Images + Insert Requirement + Artwork Status + Target Budget + Delivery Destination + Required Arrival Date
If you do not know the exact box structure or material yet, that is fine.
Mark those items:
Open to recommendation.
The goal of the first enquiry is not to have every technical answer.
It is to provide enough reliable information for the packaging team to recommend and price the right next step.